Access keys | Skip to primary navigation | Skip to secondary navigation | Skip to content | Skip to footer | Skip to page options |
Queensland Transport
Home > Projects and initiatives > Initiatives > Integrated Development Assessment System

Integrated Development Assessment System

Integrated Development Assessment System referral triggers

Since September 2005, Queensland Transport has been a concurrence agency under the Integrated Planning Act 1997. This means that, under the act, Queensland Transport can:

Schedule 2 of the Integrated Planning Regulation (PDF**, 633KB) details Queensland Transport's referral triggers.

Integrated Development Assessment System Assessment Guide, Number 23 also provides a concise overview of Queensland Transport's referral triggers. The supporting legislation and jurisdiction is detailed in the attached fact sheet.

Integrated Development Assessment System Legislation and Jurisdiction Fact Sheet (PDF**, 103KB)

top

Mapping

Some development applications trigger referrals to Queensland Transport due to their proximity to existing and future railway and public transport corridors, public transport facilities and airports. Queensland Transport has mapped the elements that trigger these referrals. This mapping can be accessed free of charge through the following link.

Integrated Development Assessment System Triggers Mapping

Queensland Transport updates its triggers-mapping from time to time. Updates to date are:

top

Optional CD lodgement of development applications

We have introduced the option of lodging development applications on CD. This initiative is an interim step in expectation of full electronic lodgement of development applications through the Department of Local Government, Planning, Sport and Recreation's Smart electronic Development Assessment (Smart eDA). Consultants sending in correspondence are requested to save the correspondence on CD as a PDF, then send the CD with a cover letter. Please find a checklist below. It contains details of Queensland Transport's preferred method for CD submission.

CD lodgement checklist for applicants (PDF**, 22KB)

Benefits of CD lodgement will include an increase in Queensland Transport's efficiency in assessing development applications and a reduction of costs associated with the preparation of reports. However, if consultants are unable to submit correspondence on CD, Queensland Transport will continue to accept hard-copy correspondence until the Smart eDA initiative is implemented.

If you have any questions, comments or suggestions regarding this matter, please contact the principal manager (Land Use) on +61 7 3117 5541.

top

Information requirements

The following checklists will assist applicants in preparing the required information and understanding desired outcomes for the Queensland Transport triggers. If all the information detailed below is provided at the time of lodgement, the assessment period is less likely to be lengthened by requests for information.

Checklists:

top

Self-assessable code for road works on scheduled bus routes

The self-assessable code is in Schedule 1 of the Transport Planning and Cordination Regulation 2005 can be accessed free of charge.

The code contains specific road design requirements or refers to standards in the Main Roads 'Road Planning and Design Manual'. The code details prescriptive standards for:

Mapping, indicating the roads that the self-assessable code applies to, can be found by accessing the mapping link below. This mapping is not definitive, and it is important to confirm details as follows:

Scheduled bus routes mapping

Integrated Development Assessment System contact list (PDF**, 100KB)

top

Contact details

There are three lodgement points across the state for Queensland Transport Integrated Development Assessment System referrals: Brisbane, Townsville and Cairns. The Queensland Transport

Integrated Development Assessment System contact list (PDF**, 100KB) identifies which office you should direct your referral and any enquiries to.

Should you require further general information on Queensland Transport's Integrated Development Assessment System role, you can email Queensland Transport at: IDASenquiries@transport.qld.gov.au.

Or, contact the Principal Manager (Land Use) at:

top


Assessment System triggers mapping

Integrated Development Assessment System triggers mapping allows you to determine whether your application will trigger a referral to Queensland Transport.

Bus route mapping displays the scheduled bus routes across Queensland.

Related information



Get Adobe Reader**While this department has taken every possible precaution with the creation of these files, they are downloaded and used at your own risk. Adobe Reader is required to open and print Portable Document Format (PDF) files and is free to download from http://www.adobe.com/products/acrobat/readstep2.html. Various tools to enable access to these files for people using a screen reader can be found at http://access.adobe.com. Further information is available from our "Help with downloading, reading and printing PDF" web page.

Last updated 27 June 2008


Assessment System triggers mapping

Integrated Development Assessment System triggers mapping allows you to determine whether your application will trigger a referral to Queensland Transport.

Bus route mapping displays the scheduled bus routes across Queensland.

Related information