Caboolture Landsborough Rail Upgrade Study
The Queensland Government has announced the 17 km rail corridor between Beerburrum and Landsborough has been approved for design and construction after extensive community consultation and environmental assessment during 2005 and 2006.
For more information visit the Caboolture to Landsborough Rail Upgrade Study page.
Reports
Stage 1 - Needs assessment
A needs assessment for the existing corridor was undertaken by comparison to Levels of Service criteria. Levels of Service criteria were based on measures determined to best represent the user's perspective of rail transport availability, comfort (public transport only), and convenience. These measures include service frequency, hours of service, passenger loads, freight loads, reliability and travel time.
Needs assessment - executive summary (PDF**, 35KB)Stage 2 - Existing corridor upgrade options
Stage 2 identified the ultimate upgrade option available within the existing corridor as a combination of full rail track duplication, revised train scheduling, improved signalling, additional station platforms at Elimbah, Beerburrum and Beerwah, and improved station facilities including lifts, lighting, security and overpasses.
Stage 2 - executive summary (PDF**, 456KB)Stage 3 - Options development and assessment
Stage 3 identified and assessed the potential benefits and impacts of corridor options not restricted to the existing corridor. The process used to select the preferred corridor option for further development and assessment involved:
- identifying of the broad range of corridor options available
- short listing the options
- assessing the short listed options against agreed criteria
- consulting the technical steering group
- consulting the community and other interested stakeholders.
Stage 3a - Development and assessment of preferred option (Option 3)
Stage 3a - executive summary (PDF**, 203KB)Beerburrum to Landsborough Corridor Report
Beerburrum to Landsborough corridor report - executive summary (PDF**, 66KB)Newsletter - August 2006
Complete newsletter
August newsletter (PDF**, 1.32MB)Sections
More publications
The complete reports and the following additional publications are available from Queensland Transport.
Reports
- Complete needs assessment report
- Complete existing corridor upgrade options working paper
- Complete options development and assessment working paper
- Complete development and assessment of preferred option
- Complete Beerburrum to Landsborough Corridor Report
Newsletters
- January 2002
- August 2002
- November 2002
- April 2003
- November 2003
To request any of these publications please contact:
- Regional Manager (South east Queensland)
- Queensland Transport
- GPO Box 213
- Brisbane Queensland 4001
- Telephone: 1800 221 991k
- Email planning.projects@transport.qld.gov.au
kFree call from anywhere in Queensland. If calling from outside of Queensland, STD rates will apply. Higher rates apply from mobile phones and pay phones. Service is manned Monday to Friday 8.30am to 5pm EST (GMT +10) excluding public holidays.
**While this department has taken every possible precaution with the creation of these files, they are downloaded and used at your own risk. Adobe Reader is required to open and print Portable Document Format (PDF) files and is free to download from http://www.adobe.com/products/acrobat/readstep2.html. Various tools to enable access to these files for people using a screen reader can be found at http://access.adobe.com. Further information is available from our "Help with downloading, reading and printing PDF" web page.
Last updated 01 August 2008